Get a browser that supports frames!
The deck surface is composed of 2.5m x 5.0m paving slabs in reinforced concrete. Slabs are assembled to provide a dedicated drainage system. The paving surface is finished with a waterproofing membrane and a tarmac wearing course. The upper deck can also be treated with polyurethane resin, an antislip and antiskid surfacing system which produces the best performance in terms of resistance and suits specially to peculiar climate conditions. The physical and mechanical properties of the deck surface give highway quality traction for traffic at a comparable and negligible level of noise. The floor is also designed to resist the effects of chemical (oils and hydrocarbons) and atmospheric agents.
Efficiency of car storage and fast installation are two of many outstanding benefits of the Fast Park® system to car dealers. As shown by the example in a London suburb, at low cost, the system can be easily transformed into a prestigious showroom. Car parking enhancement on these commercial sites can be added value services to clients, without substantial economic investment. Depending on operational needs a deck system can offer independent levels and areas for show cars and discreet storage.
The Fast Park® system has been successfully installed in many European railway stations offering its unique flexibility and cost-effectiveness where other solutions might not be appropriate or able to build. (i.e.: inside abandoned dismissed factories which could therefore be renewed).
The Fast Park® system has proved to be of particular benefit to transport interchanges where it has provided a temporary or intermediate solution.
Fast Park® is particularly appropriate for highly frequented and congested parking areas because the installation can be phased to ensure maximised use of existing parking operations and revenue protection, whilst also minimising disruption during installation.
Traditional parking facilities in hospital sites very often create inconveniences to users because of the length of works. Spaces are often lost to provide for the needs of site storage of tools and equipment and plant and building materials which can be very large. The loss of car parking spaces contributes to other parking and traffic congestion concerns.
Fast Park® is successful in hospital environments because the installation is a compartmental progression across a car park using only a pick-up based HIAB, small fork-lift truck and hand tools and causes the least disruption to an ongoing parking operation, and just as importantly, to its revenue stream. Installation is without the disruption normally associated with traditional building. There is no use of large cranes or plant and the site is clean with very minimal noise.
The Fast Park® system finds favour with local authorities, as it does not conflict with the ability to plan ahead and is the ideal solution between surface and multi-storey car parks.
The structure is 100% demountable and re-usable offers many advantages, amongst which are:
Although designed as a permanent structure, planners can be assured that if given temporary permission, it can easily be removed to make way for development,
Being surface mounted there is no intervention on underground services, archaeological remains or hydrological considerations and in the case of contaminated land, there will be no disturbance: if and when installed or removed and there will remain no detrimental footprint on the environment,
Rather than to demolish and dispose of a fixed construction after use, there will remain a residual and asset value for the owner.
The best welcome in a retail area is its nice, accessible parking area. If it is easy to find, a car parking space, with simple maneuvering and without traffic congestion, means to the customer to comfortably reach the point of sales. The Fast Park® system assures generous bays and with its open and well lit environment; one of the factors of safe and secure car parks. In appropriate circumstances a modular car park deck can make a very substantial difference to the efficiency and economy of a commercial operation.
Match 11 for the city of Belgrade.
The smart modular parking technology of the demountable freestanding parking deck FastPark® challenges the crisis and gains its 11th installation in the city of Belgrade.
Belgrade – June 2010. 11th installation Fast Park® for the Serbian Capital. Located in one of the most famous and crowded places in Belgrade, Slavija Trg, the new parking solves the most critical issues in parking demand of one of the most important urban centralities. A huge number of buildings which host activities from the service sector (Incentive Houses, Retail, Hotels, etc.) and a proportional car parks quantity can now dispose of a brand new parking system with capability 128 car spaces.
Next to record time of works completion, the speed investment. The installation has allowed to JKP Parking Servis, the city owned company engaged for a long time in local parking management, to double the existing parking area in only 30 days. The safety of investment comes along with the cost effectiveness of the system, consequently allowing the highest return on investment conceivable for a parking structure. The payback period of the initial capital expenditure corresponds indeed to a time span of just a few years of parking management. A solution that can afford the problem of parking congestion is simply and dynamically increasing business, despite of the crisis.
Fast Park® shines under the Sun
The Fast Park® Team is delighted to launch Fast Park® Shades, a special range of services to add a modular roofing system, pre-engineered to be clad with photovoltaic claddings, to the top floor of Fast Park®.
This original eco-friendly parking shades concept has been already developed in two different options and successfully installed 2009 in Mérida, Spain.
Fast Park Shades allows to create an additional roof on the top deck parking bays and to boost the parking operators' business. The offer includes the ability to adapt the product to corporate and design needs (e.g. modules inclination, electric vehicles parking spaces and charge options, special fittings to blend with the environment, wherever requested).
Palermo, Fast Park® opens at a new electrical goods store
The opening of a large Euronics sales outlet in via Pietro Nenni, Palermo (Sicily) was the focus of the final Fast Park® project to close 2009. The project included the construction and enhancement of a car park to be completed before the end of the year that satisfied the parking and traffic flow needs of a shopping mall. The parking structure adopted by the client, Edilpa SpA, is actually the same one built some years ago in Palermo, a few kilometers from Euronics, inside the Auchan Shopping Centre. The Fast Park® - Euronics hosting capacity is 100 new car spaces and, since its opening on 7th December, the parking deck has seen record amounts of parking and excellent traffic circulation.
The Parking " Bordeaux Armagnac "
A new facility Fast Park® will be opened on 26th November in the capital of Aquitaine in France. The car park, known as Parking Bordeaux Armagnac, is located inside the old Halle Sernam near the city station which was originally a depot belonging to the SNCF, the French railways management company.
The Hall, turned into a parking area, is part of a renewal project for the factory which was still to exploit. As the car park is a demountable deck, the project submitted by EFFIA, the french parking and traffic management company, engaged in multimodal solutions, planned to exploit the parking deck for some years. Afterwards, Fast Park® will be disassembled, each element recycled and the factory will be converted to further use.
Although installed inside a factory, the new parking structure complies totally with local antifire requirements. Features of the ancient hall building in favor of the renewal and conversion into steel parking deck were headroom and height clearance between the columns. As a result, an abandoned building has been reused and its own architectural appearance mitigates the impact of the camouflaged parking unit.
432 new car spaces are now available within the patented modular one storey deck system, 3 of which are at the ground level for electric vehicles. A number of parking lots reserved for car rental services complete the multitasking parking offer.
Second Fast Park® in Mérida
Following to the opening of a first structure in April 2009, the installation of a second Fast Park® in Mérida, Spain, has been completed these days. The new city parking is located in the heart of the city- in an area of ancient factories "Maderas Leon" traversia Cervantes nearby. It serves the citizens with 140 new car spaces, respecting all site constraints of a worth seeing area. The former boundaries have been kept, a significant effort in design and execution was required, a careful blend with the environment and a soft impact on the existing structures and vehicles have been achieved.
The use of special beams to support the modular roofing system on the top floor reduces the number of columns and increases the span between the car spaces for better maneuvering.
A versatile, reversible work that has been completed in only sixty days.
Fast Park® in Mérida
The Go Live of the latest Spanish Fast Park® installation in Spain will be launched the 23. April in Mérida. The parking is located within the premises of the Polytechnic belonging to the municipality of the city. The project allowed to double the existing car park surface by means of a modular deck system. Total capacity of the new parking is 355 car places.
Mérida is the capital of the autonomous community of Estremadura and preserves more important ancient Roman monuments than any other city in Spain, it has been defined "the Spanish Roma" and because of this, the "Archaeological Ensemble of Mérida" is a World Heritage site. One of the main reasons in favor of choosing Fast Park® was the compatibility of its foundations system with the presence underground of an archeological site that might be brought to light in the future once the car park is removed and installed elsewhere.
Actually, the possibility to dismantle the freestanding deck and the fact that foundations are friendly choice made the product profitable. Authorization for the implementation and operation has been granted by Ayuntamiento de Mérida to the Car Parking Management Company Cintra Aparcamientos.
A modular roofing system to the top floor has been pre-engineered and installed to be clad with photovoltaic panels.
Fast Park® in Ravenna
Many years after the first installation in Ravenna (1992), a new modular parking unit without foundations has been completed in the town. The Product Fast Park® is resulting by many research issues, structural tests and development: the upper deck is treated with a special waterproofing system, finished with steel, asphalt and concrete; the parking deck is provided with claddings to blend with the environment.
Hosting capacity of the new parking deck is 128 car places. Achieved upon request of the Client C.M.R. of Filo, the parking structure has been conceived to serve the parking needs of the Holiday Inn Hotel Ravenna, which is now under construction.
A new Fast Park® in Messina, Italy
A new parking deck system without foundations has been achieved in Messina, Italy. For the enlargement of the on street parking in Via degli Agrumi the installation of two Fast Park® units, totally 510 car places has been planned.
An added value of the product is the flexibility of the design solution proposed: two separate parking areas have been linked to each other by means of a bridge connecting on a split level land the ground floor of the first unit to the upper deck of the second parking structure, granting easier accessibility.
Also in this case dismantling is possible and the site can be furthermore differently exploited. An opportunity which could be very useful for future development plans, it has been considered by the city of Messina, actually aims to recycle the modules bought for the occasion, planning and dismantling on other town areas.
Rowan Car Park Deck Ready
A new modular single deck car park without foundations has raised at Stepping Hill Hospital, located on the site of the ancient area known as "Rowan House Building".
Satisfied with the same solution adopted some four years ago at other locations within the Hospital premises the Client, Stockport NHS Foundation Trust, has relied on a Fast Park® facility again to cope with a quick surge in parking demand, time required to install and operate the parking was only ten weeks. Quick installation was not the only one advantage to prefer Fast Park® to other parking facilities. Fast Park® offers additional benefits with regards to construction method, time and cost savings.
First, as hospital sites handle significant volumes of pedestrian and vehicular traffic, the specially trained Fast Park® workforce was able to work within isolated work areas protected with hoardings and warning signs and outside peek hours for hospital traffic, minimizing disruption to normal traffic and pedestrian movement. Also delivery of materials are programmed to arrive outside peek hours and arranged in advance with the Client.
Besides, the upper deck surface has been specially treated with a polyurethane resin, an antiskid surfacing system which produces the best performance in terms of resistance and raises the commercial standards of technologic innovation and cost optimization.
The new modular parking deck serves with 120 new car places to the technical building, the plant room and some other departments nearby located.
Fast Park® in Qatar
It seems to be a Fast Park® facility exactly like many others which have been installed all over Europe, but it is not. A Top Provider of its patented parking facility covering the market segment in between the long term and costly and the short term and not sustainable solution, the group Fast Park® tells about its first Case History overseas demonstrating to be conceived as the most suitable product, of flexible design to be fitted in an urban context which grows and changes dynamically, it is just the case in Doha, at the Airport:
Two parking units of 186 and 147 car places have been erected one next to the technical building and the other serving the administrative staff area of the airport in conditions of total safety and avoiding to be disruptive to the daily pedestrian flows;
Because of the peculiar climate conditions, the largest part of the civil works has been carried out overnight. A team established and trained to work overnight, available 24h, has allowed to achieve the installation one week before the contractual completion date.
Also the procurement of raw materials locally was not easy but the Company could face it with a rapid intervention on site. Materials available on the local market are not always complying with EU Quality Standards and the different weather conditions brought the Technical Direction to program in advance a solution of site logistics certainly more difficult but easy to integrate in the construction methods of Fast Park®. The result: the traditional use of a waterproofing membrane on the upper deck and a conventional system of road markings and signs have been replaced to raise the commercial standards of technologic innovation and cost optimization. The upper deck is completely finished with polyurethane resin. A colour difference between grey and green zones has been used to make a distinction among parking bays and driveways and more aesthetic appearance grants to the parking a not negligible capacity to blend in with the environment and more visibility to the users.
Technology innovation also includes some new adjustment devices to offer better manoeuvrability. It seems to be a temporary parking similar to some other ones, but it's not.
function open_window( URL ) {
window.open(URL,'Images','toolbar=no,directories=no,location=no,status=no,menubar=no,scrollbars=yes,resizable=yes,copyhistory=no,width=600,height=450' );
}
ParkingNews -
(pdf 552Kb) 06/2010
Speed is just the ticket
Europarking -
(pdf 859Kb) num 1 - 01/2010
Parking in Palermo
L’Ufficio Tecnico -
(pdf 330Kb) n.1/2010
Il nuovo Parcheggio Bordeaux Armagnac
Parking Trend International -
(pdf 334Kb) Number 4, December 2009
Fast Park®: 'Bordeaux Armagnac', the parking inside the Hall
ParkingNews - 12/2009
Temporary measures
www.hoy.es -
23/10/2009
Aparcar en el centro ya no es imposible
Euro Parking -
(pdf 306Kb) num 5 - 10/2009
The development of Fast Park® into the Spanish market
Die Entwicklung von Fast Park® im spanischen Markt
Parking Trend International -
(pdf 675Kb) Number 3, September 2009
Second Fast Park® in Mérida
Euro Parking -
(pdf 998Kb) num 4 - 08/2009
Fast Park® at EPA congress
Fast Park® beim EPA Kongress
Euro Parking -
(pdf 2,18Mb) num 3 - 06/2009
Fast Park® in Mérida
Progetto e Pubblico -
(pdf 196Kb) num 40 - 05/2009
Parcheggi performanti per la sanità
Extremadura -
(pdf 183Kb) 24/04/2009
Unos 550 coches pasarán al día por el parking de la Politécnica
Publico -
(pdf 185Kb) 24/04/2009
El aparcamiento de la Politécnica acoge 850 vehículos al día
Parking News -
(pdf 143Kb) 04/2009
New modular single deck car park for Stepping Hill Hospital
Of Arch -
(pdf 592Kb) Arch n. 105 11-12/2008
Il parcheggio veloce
Fast parking
Euro Parking -
(pdf 461Kb) num 06 - 12/2008
Fast Park® in Qatar
Parking Trend International -
(pdf 503Kb) Number 4, December 2008
Fast Park® in Qatar
Euro Parking -
(pdf 203Kb) num 4 - 08/2008
The growth of flexible parking solutions
Die Entwicklung von flexiblen Parklösungen
Euro Parking -
(pdf 111Kb) num 2 - 04/2008
How to get a double parking area
Wie man Parkfläche verdoppeln kann
Parking Trend International -
(pdf 65Kb) 03/2008
New Fast Park® experience at Trento Airport.
Auto -
(pdf 1532Kb) 03/2008
Così ti raddoppio il parcheggio
www.quattroruote.it -
(pdf 952Kb) 18/12/2007
Fast Park® sbarca in Francia
Parking News -
(pdf 33Kb) 02/2008
Fast Park® in France
TEC – Janvier 2008 Special Stationnement -
(pdf 173Kb) 01/2008
Fast Park® en France: comment dédoubler les aires de stationnement
Parking Trend International -
(pdf 47Kb) 12/2007
No sooner said than done
Parking Trend International -
(pdf 43Kb) 12/2007
Fast Park® in France: How to get a double parking area
fidest.net -
(pdf 1,05Mb) 11/12/2007
Fast Park® vola in aeroporto
IdeaDemocratica -
(pdf 840Kb) 07/12/2007
L'innovazione vola in aeroporto
La Repubblica -
29/10/2007
Infrastrutture mobili per il parcheggio Dal Web la proposta di
Fast Park®
EFFIA -
10/2007
Inauguration du parking de la gare de Valenciennes
Libero Mercato -
(pdf 68Kb) 24/08/2007
Fast Park® - Parcheggi smontabili in città
Avanti -
(pdf 81Kb) 23/08/2007
Fast Park cambia look
Gentemotori -
(pdf 45Kb) 10/06/2007
Novità - Come ti raddoppio il parcheggio
Euro Parking -
(pdf 230Kb) 06/2007
No sooner said than done: Fast Park® between Parkex and Traffex
Gesagt, getan: Fast Park zwischen Parkex und Traffex
Lavori pubblici -
(pdf 139Kb) 05-06/2007
Parcheggi - Una soluzione efficace al problema della sosta
Euro Parking - (pdf 341Kb) 04/2007
Parking space just the way you need it
Parkraum, so wie man ihn braucht
Parking
News - (pdf 36Kb) 03/2007
Steel solutions
Tivoli: biciclette gratuite nel Fast Park® di Piazza Matteotti
Dentro
- (pdf 572Kb) 03/11/2006
Piazza Matteotti: arrivano le biciclette gratuite
Il Messaggero - 02/11/2006
Entro dicembre al multipiano di piazzale Matteotti aprirà il primo
punto bici: due ruote gratis per tutti
www.comune.tivoli.rm.it - 31/10/2006
in arrivo le biciclette gratuite nel parcheggio comunale “fast park®” di Piazza Matteotti
www.tibursuperbum.it - 31/10/2006
in arrivo le biciclette gratuite nel parcheggio comunale “fast park®” di Piazza Matteotti
SitoPreferito Magazine - (pdf 515Kb) 11/2006
Tivoli: in arrivo biciclette gratuite
Il
Mondo - (pdf 58Kb) 11/2006
Fast Park® sempre più internazionale
Central
Goverment - (pdf 82Kb) 11/2006
Unique single deck parking system
Central Goverment
- (pdf 77Kb) 11/2006
Parking panacea?
Il Tirreno
- (pdf 93Kb) 23/09/2006
Poche ore e il parcheggio è costruito
L'Avenir -
(Belgium) 31/08/2006
NAMUR : du football au parking
Le
Soir - (Belgium) 31/08/2006
750 places de parking supplémentaires
La
Libre Belgique - 31/08/2006
Namur - Nouveau parking au CHR
La
Libre Belgique - 28/08/2006
250 places de parking en plus
Parking
Trend International - (pdf 53Kb) 08/2006
Fast Park® in Belgrade: the city parking solution on demand.
PARKING
Review - (pdf 117Kb) 06.2006
A quick cure for hospital parking problems.
Traffic
Tecnology & Parking - (pdf 310Kb) 05/2006
Italia - Inghilterra, vince Fast Park®
La
Repubblica (Affari e Finanza) - 23/05/2006
"Fast Park®", creare parcheggi
auto diventa facile con la tecnologia
Parking
Trend International - 03/2006
Why so many NHS trusts in England have decided to invest in Fast Park®?
Parking
News - (pdf 51Kb) 03/2006
Fast Park® provides 220 extra hospital bays
Oxford
Mail - 03/02/2006
An injection of parking spaces
Inaugurazione del Fast Park®
a Roma con il sindaco Veltroni.
Metro
- (pdf 126Kb) 23/01/2006
Aperto il parcheggio Trastevere. A due passi dalla Ztl, 221 posti
La Repubblica
- (pdf 70Kb) 22/01/2006
Trastevere, ecco il nuovo parcheggio
Corriere
della Sera - (pdf 145Kb) 22/01/2006
E Trastevere ha il suo parcheggio
Il
Tempo - (pdf 171Kb) 22/01/2006
Sosta a Trastevere, l'incubo è finito
Traffic
Tecnology & Parking - (pdf 565Kb) 10/2005
Cantieri Fast Park® aperti per lavori
La
Gazzetta del Mezzogiorno - 05/12/2005
Progetto murattiano finalmente uniti per il nuovo «centro»
Il
Tempo - 16/11/2005
Piazza Gimma, parking no-stop Posti multipiano in via Tripolitania. Parte
il progetto per via Homs
Emilianet
- 15/11/2005
Piazzale Maestri del lavoro, si parcheggia Dal 16 novembre si potrà di nuovo
sostare, con disco orario
GVBusiness.it -
20/06/2005
Operativo il nuovo Fast Park® all'aeroporto di Orio al Serio
Il Giornale
- (pdf 69Kb) 20/05/2005
Il Parcheggio intelligente? Lo fa un'azienda romana
Capital
- (pdf 162Kb) 04/2005
Fast Park® - rapide risposte ai problemi del traffico
Traffic
& Parking - (pdf 252Kb) 02/2005
Fast Park®: funzionalità, ergonomia, economicità su larga scala
Traffic
& Parking - (pdf 147Kb) 04/2004
Approda oltre manica il parcheggio intelligente.
Sport
Magazine-Foot Magazine - (pdf 205Kb) 28/02/2004
Beau parcours, Harold!
Il
Messagero Veneto - (pdf 112Kb) 11/10/2003
Aperto il parcheggio multipiano: ospita quasi 600 automobili.
L'Arena - (pdf
132Kb) 06/07/2003
Al Catullo «decollano» 750 posti auto
Affari
& Finanza - (pdf 79Kb) 22/05/2003
"Fast Park®", creare parcheggi auto diventa facile con
latecnologia
Parking
Servis - Belgrado - 02/2003
Official presentation of the JKP "PARKING SERVIS" Beograd
PARKING
Review - 05/2002
Movable steel parking decks
Il
Giornale di Sicilia - 22/05/2002
Parcheggio, in arrivo altri 200 posti-auto
Il
Giornale di Sicilia - 27/03/2002
Punta Raisi, a giugno decolla il parcheggio: "Oltre 200 posti in più"
A wide range of services after selling is immediately available upon request, including checks and assessments on site or any eventual supply of spare parts and refurbishment.
Is it possible to install the Fast Park® structure in a seismic zone?
Yes. Fast Park® has been specifically designed with special reinforced elements to enable use in seismic zones.
What is the life expectancy of the structure?
Composed of high quality, resistant materials, the Fast Park® system has a long life cycle and durability. All Fast Park® system elements are treated with hot zinc galvanising by immersion, giving the steel frame a double, physical and electrolytic protection.
The concrete used for construction of the deck surface elements is carefully vibrated with an additional fluidity agent, in order to increase mechanical resistance and waterproofing. The product was also successfully noise-tested.
Is Fast Park® a solar parking?
An additional roofing system to the top floor has been pre-engineered to be optionally clad with sun shades.
The long-established on board expertise of the Fast Park® team makes possible to the Client to be outstandingly advised and assisted into the choice of the most proper financing method. Following the amortization schedule, the initial capital expenditure will be paid off in a few years. The cash flow alone will actually cover the financial costs of the investment in a very short time and also ensure the debt recovery coming from maintenance and management costs.
The purchase of permanent parking structures could be in many cases not affordable, their real utility unpredictable, despite of them Fast Park® can be easily bought and conveniently operated.
Fast Park Sistema s.r.l.
Viale dei Colli Portuensi, 545
00151 Roma
Tel: +39 06 657 459 42
Fax: +39 06 657 459 43
fastpark@fastpark.com
Representation Office:
Blvd. Audent, 29
6000 Charleroi
Belgium
Name:*
Surname:*
Telephone:*
e-mail:
Message:
I consent the use of my personal information according to Legislative Decree no. 196/2003
* obligatory
Registro Imprese Roma n. 00902240589 ·
R.E.A.: Roma n. 380325 ·
C.F. 00902240589 ·
P.IVA: IT00941341000
Fast Park®
Worldwide
Spain
Fernando Clavijo
Livio
c/ León XIII, 36
Bollullos del Condado
21710 Huelva
Tel/fax: +34 959 41 29 86
Movil: +34 610 24 90 95
direccion@livio.es
Srbija, Montenegro
Bosnia - Herzegovina,
Macedonia
JKP Parking Servis
Direkcija – Projektni biro
Milentija Popovica 9
11000 Beograd
SRBIJA
tel: +381 11 2228-006,
fax: +381 11 2228-119
projektni.biro@parking-servis.co.rs
www.parking-servis.co.rs
Benelux
Mr. Joe Hulshof
26 Avenue de Versailles
1020 Bruxelles
Belgium
tel. +32 473 790301
fax: +32 2 2621578
fastparkbe@yahoo.fr
Hungary
Mobil Parking Hungary Kft
Szentendrei Ut
1033 Budapest
Tel: +36 1 430 12 80
Fax: +36 1 430 12 79
mobilparkinghungary@gmail.com
Sub-Saharan Africa / South Africa
Modular Parking Solutions PTY (Ltd)
PO Box 515 Eppindust,
Cape Town 7475
South Africa
Phone: +27 21 535 4152
email: alan@modularparking.co.za
www.modularparking.co.za
The Fast Park® system is composed of 5.0m x 5.0m modular steel elements. Hot-dipped galvanized pillars and beams create the structural steel frame.
Designed to be installed without foundations, the system has adjustable height and will take up undulations in the surface by means of a base plate on which is located a hemi-spherical node, to ensure verticality of the column. Wind braces assure the avoidance of abnormal stresses.
Being flexible and modular the Fast Park® structure provides truly fast and accurate installation, easy maintenance.
Originally designed to meet the parking needs of an International airport authority, the system Fast Park® solves today the problem of congestion in many international airports. The evolution of the original specification now offers a wide range of benefits not available with other solutions. In the Airport Industry parking needs are growing and their capacity has to be managed dynamically. The enhancement of the airport parking capacity could be linked with very urgent development plans but only temporary needs. With the development of the small local airports and low cost airlines, Fast Park® is a truly cost effective and real solution to long or short-term parking problems.
The structure is supplied with external aesthetic cladding from a standard range. Other options are available.
Cladding is designed to meet the needs of a corporate image or that of planners. The options are:
Prefabricated, exterior panels in lightweight concrete surfaces finished with washed gravel
Steel side-cladding panels (Wall panels)
Special panels (marble, stones, etc.)
Coated steel architectural elements
A modular roofing system to the top floor pre-engineered to be clad with photovoltaic panels.
Every Fast Park® structure is designed to consider the specific needs of the client blending with its own environment
Modular components with adjustable features ensure a simple, fast and accurate installation or easy dismantling operation.
The system can be easily dismantled and reassembled on another site and in different configurations, even if that site has different topographical features, reusing virtually 100% of the components.
Having no traditional foundations, on removal, Fast Park® will leave no lasting environmental foot print Although designed to be permanent and with a long life cycle, this system can also provide a temporary or intermediate solution if land is needed for future development but without commitment to a permanent construction.
A wide range of optional elements are available to finish the structure and to suit planning or corporate needs.
Troughs and pots for cosmetic plantings on the upper floor
Troughs and pots for cosmetic plantings in concrete around the ground floor
Plastic pots allocated on steel frame on the upper deck
Grating elements
The Fast Park® is a complete "turn-key" package including all technical equipment comprising:
Bright under floor lighting
Optional upper floor lighting; optional pedestrian ramps
Earthing and lightning protection system
Bay markings, traffic lines and signs
Fire protection systems/equipment (wherever required by regulation)
DDA Compliant staircases (UK)
Fast Park® is the original and innovative, patented, modular, one deck car park system designed to virtually double the capacity of an existing or new surface area, by use of a free-standing deck installed in the minimum of time with the least disruption.
Pre-fabricated elements are installed on the surface without any traditionally excavated foundations.
The finished structure can be demounted and 100% re-assembled on another site in many different configurations.
In many cases installation can be phased to retain spaces for an ongoing parking operation and its revenue stream. Fast Park® is the ideal solution to increase capacity, between surface and multi-storey car parks.
foto: massimo berretta - http://www.massimoberretta.it/ http://www.softsia.it